TSAM_banner2

 

 

FACULTY OF SCIENCE TECHNOLOGY ENGINEERING AND MATHEMATICS (FOSTEM)

Diploma in Industrial Engineering (DIE)

1997

 

 

1998 | 1999 | 2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | Main list

 

 

 

 

 

 

 

 

Title

Name

 

 

 

 

 

A Fortran computer program model of the work sheet balance algorithm

Chua Seong Hai

 

 

A robotic animation model on cube stacking operation

Kwok Siew Peng

 

 

Assembly line improvement project

Ananthajayan Ramanathan

 

 

Design a human chairs with human factors concerned

Burhanudin Abd Jalil

 

 

Design a student table and chair: build the model on work space applying ergonomical concept

Wong Tsen Hin

 

 

Develop a computer simulation model of customer movement in a fast food restaurant outlet

Loh Chia Lin

 

 

Ergonomically designed public telephone

Lee Wee Thiam

 

 

The ideal classroom environment

Kevin Shawn Fernandez

 

 

Layout proposal in oil packing section for new factory of Lam Soon

Tan Lay Ai

 

 

Simulation model for Subang Jaya post office

Lim Seng Tark

 

 

Study of human anatomy limitations in term of load, speed and distance for targeted group of people

Book Chan Hoong

 

 

Write a FORTRAN program to retrieve the address of a student considering ergonomic concepts

Chin Kin Heng

 

 

Build a small scale manufacturing process that operates

Lau Lee Ping

 

 

Designing a ball-point pen with human factor consideration

Kerk Ser Yong

 

 

Design a table-top ironing board with optimum operational and ergonic consideration

Lee Sin Yuon

 

 

Design an ideal work cell that can be integrated into a specific robotic handler

Siow Ka Yee

 

 

Develop a modified layout based on the existing layout of Impact Color Sdn. Bhd.

Lee Yeek Men

 

 

Develop a quip model for the model for the enrolment/ registration procedure for AUP courses

Yong Kok Sheng

 

 

Establish a set of standard time for changing a car wheel in a tyre shop using work sampling technique

Chin Set Tze

 

 

Evaluate the efficiency of the queing system in a banking institute using ARENA software

Loh Tee Chiat

 

 

Simulation of manufacturing resource planning

Lee Yih Feng

 

 

Simulation of manufacturing resource planning

Ng Bee Tin

 

 

Simulation of manufacturing resource planning

Tin Wing Yee

 

 

Simulation of material requirement planning situation for A product

Leong Siew Shen

 

 

Simulation of MRPII of door lock

Wee Lee Mein

 

 

Systematic layout planning in Mattel

Leonard Pang Tai Leong

 

 

Time study analysis for light commercial vehicle

Ng Shya Hoong

 

 

To solve a production problem in a particular process line in XXX company in Klang Valley

Chai Pooi Hang

 

 

Design baby-chair for dining purpose with human consideration

Tan Kang Kai

 

 

Ergonomic designed bicycle

Aaron Gomez

 

 

Ergonomic design secretary work table and chair

Lai Mei Yun

 

 

Ergonomic designed toilet

Tay Bryan Hiok Liang

 

 

Ergonomically designed graphic room

Tan Soo Kuan

 

 

Improve the plant layout to enhance the productivity

Loo Chean Lin

 

 

MRPII

Lim Choon Hiong

 

 

MRPII (Computer keyboard)

Tey Mei Lin

 

 

MRPII for mini racing car

Chin Jeng Feng

 

 

MRPII layout planning of Asia Pharmaceutical Products Sdn Bhd in a manufacturing environment

Tan Hui Shing

 

 

MRPII (Manufacturing Resource Planning)

Choo Pei

 

 

MRPII manufacturing resource planning

Yik Swofino

 

 

Simulation of MRPII for mini torch light

Tan Melissa Chea Ling

 

 

Solving inventory and material handling problem

Goh Li Yong

 

 

Solving a production line problem in Malaysian Mirrors Sdn Bhd

Henry Lewis

 

 

SPC (Analysis for sheet board)

Lee Amy Mee Lin

 

 

Translate management plan into detailed plans utilizing MRPII

How Yin Yin

 

 

Using Qbasic to write a stopwatch program to perform the task of time study using snapback method concept

Lim Ser Siong

 

 

 

 

 

MAIN LIST

HOME