PROJECT PAPER TITLE LIST

 

DIPLOMA IN INDUSTRIAL ENGINEERING

AUGUST 1997

APRIL

AUGUST

DECEMBER

 

 

Title

Name

 

 

Build a small scale manufacturing process that operates

Lau Lee Ping

 

 

Designing a ball-point pen with human factor consideration

Kerk Ser Yong

 

 

Design a table-top ironing board with optimum operational and ergonic consideration

Lee Sin Yuon

 

 

Design an ideal work cell that can be integrated into a specific robotic handler

Siow Ka Yee

 

 

Develop a modified layout based on the existing layout of Impact Color Sdn. Bhd.

Lee Yeek Men

 

 

Develop a quip model for the model for the enrolment/ registration procedure for AUP courses

Yong Kok Sheng

 

 

Establish a set of standard time for changing a car wheel in a tyre shop using work sampling technique

Chin Set Tze

 

 

Evaluate the efficiency of the queing system in a banking institute using ARENA software

Loh Tee Chiat

 

 

Simulation of manufacturing resource planning

Lee Yih Feng

 

 

Simulation of manufacturing resource planning

Ng Bee Tin

 

 

Simulation of manufacturing resource planning

Tin Wing Yee

 

 

Simulation of material requirement planning situation for A product

Leong Siew Shen

 

 

Simulation of MRPII of door lock

Wee Lee Mein

 

 

Systematic layout planning in Mattel

Leonard Pang Tai Leong

 

 

Time study analysis for light commercial vehicle

Ng Shya Hoong

 

 

To solve a production problem in a particular process line in XXX company in Klang Valley

Chai Pooi Hang

 

 

 